TEL: 17011867007

Shanghai Moqian Technology Co., Ltd. Design Plan

Nov,06,2019 << Return list

Shanghai Moqian Technology Co., Ltd. Design Plan


Shanghai Moqian Technology Co., Ltd. Design Plan

I. Infrastructure Layout

  • R&D Design Center: Dedicated quiet zone equipped with high-performance workstations, meeting rooms, and a 3D printing verification area.

  • Precision Machining Workshop: Temperature-controlled (20±2°C), dust-proof, with anti-vibration foundations capable of supporting large equipment (e.g., gantry machining centers over 10 tons).

  • Mold Assembly Area: High cleanliness level (ISO Class 8 or above), equipped with large assembly platforms and overhead crane systems.

  • Trial Production Center: Adjacent to the production workshop, equipped with multi-tonnage injection molding machines (50~3,500 tons), die-casting machines, and real-time monitoring systems.

  • Testing Laboratory: Independently isolated vibration environment, equipped with precision instruments like CMMs (Coordinate Measuring Machines) and spectrometers.

  • Material Storage Area: Automated smart warehouse with categorized storage. Special mold steels (e.g., SKD61, H13) require humidity-controlled storage.

Key Talent Capabilities:

  • Core technical personnel possess cross-disciplinary skills (e.g., Design + CAE Analysis, Programming + Equipment Commissioning).

  • Senior technicians hold certifications from international equipment manufacturers (e.g., DMG MORI, GF Machining Solutions).

  • Regular internal technical training (≥16 hours/month) and international technical exchanges (e.g., EuroMold exhibition).

IV. Synergistic Ecosystem for Success

  • Digital Hub:

    • Deployment of PLM (Product Lifecycle Management) + MES (Manufacturing Execution System), enabling data-driven processes from design to delivery.

  • Green Manufacturing:

    • Workshops equipped with centralized cooling systems (energy saving 30%+) and cutting fluid recycling units (waste reduction 90%+).

  • Industry-Academia-Research Integration:

    • Collaboration with universities to establish mold material laboratories (e.g., developing high-thermal-conductivity copper alloy mold steels), achieving a technology transfer cycle of <6 months.